Stockout Cost & Lost Contribution Estimate
Estimate lost contribution and expedited-fulfillment cost from stockout days and demand.
How the calculation works
Multiply daily demand by stockout days, price lost contribution, add expedited recovery cost and divide by stockout days when positive.
Worked example
Example inputs — Average demand per day (units): 100; Stockout days: 3; Contribution per unit: 5; Expedited replenishment or recovery cost: 500. Expected results — Units of demand affected: 300 units; Lost contribution: 1500 your currency; Expedited and recovery cost: 500 your currency; Modeled stockout cost: 2000 your currency; Cost per stockout day: 666.6666667 your currency/day.
Assumptions and limits
A planning scenario, not a demand forecast, service-level guarantee or accounting entry. Substitution, backorders, lost customers, cancellations, seasonality, safety stock and recovery timing require a fuller supply-chain analysis.
Reference and further reading
Read the underlying subject reference. Calculith is an independent implementation; the reference does not endorse or certify this tool.
Related calculators
- Gross Margin, Markup & Unit Profit Calculator
- Product Profit, Revenue & Margin Scenario Calculator
- Break-Even, Target Profit & Margin of Safety Calculator
- Two-Product Sales Mix Break-Even Calculator
- Operating Leverage Sales Sensitivity Calculator
Example values are editable. Results are estimates where assumptions apply. Calculations run in your browser. Updated 2026-11-16.